-

The making of the new Elimination Chamber structure

WWE.COM has an interesting video on the construction of the brand new Elimination Chamber structure. The design and built of this new structure was left in the hands of Atomic Designs.

“We do a lot of stuff that we talk about being bullet proof, and anytime WWE calls, it’s not a metaphor anymore…it really needs to be bullet proof,” said Zek Keller, the project leader for Atomic.

The company has never built anything like this before, noting that WWE wanted a bigger, stronger, completely resistant structure with better visibility for the aerial cameras.

The structure – 26 feet high, 10 tons of steel, and almost 2 miles of chain link – required between 4,000 and 5,000 men hours to construct with material being ordered in bulk “in record time” to meet the deadline.
 
“I’m not worried about the Chamber, I’m worried about them,” added Keller in the interview.

You can see the video on WWE.COM.


Discover more from Wrestling-Online.com

Subscribe to get the latest posts sent to your email.

Colin Vassallo
Colin Vassallohttps://www.wrestling-online.com
Colin Vassallo has been editor of Wrestling-Online since 1996. He is born and raised in Malta, follows professional wrestling and MMA, loves to travel, and is a big Apple fan!

Stories you might also likeRELATED
Recommended to you

LATEST NEWS

Cody Rhodes shares “suggestions” note by CM Punk for Team USA members

Cody Rhodes shared a handwritten note that CM Punk gave him on Smackdown yesterday with "suggestions" for names to...

Collision rating for 11/11/2026

The one-hour Collision which aired immediately following Dynamite on Wednesday drew 500,000 viewers, up from the 376,000 the show...

Full Gear 2026 live tonight on pay-per-view, full card and how to watch

Live from the Mortgage Matchup Center in Phoenix, Arizona, AEW presents Full Gear 2026 on pay-per-view. The full card...