WWE Replica Titles

-

The making of the new Elimination Chamber structure

WWE.COM has an interesting video on the construction of the brand new Elimination Chamber structure. The design and built of this new structure was left in the hands of Atomic Designs.

“We do a lot of stuff that we talk about being bullet proof, and anytime WWE calls, it’s not a metaphor anymore…it really needs to be bullet proof,” said Zek Keller, the project leader for Atomic.

The company has never built anything like this before, noting that WWE wanted a bigger, stronger, completely resistant structure with better visibility for the aerial cameras.

The structure – 26 feet high, 10 tons of steel, and almost 2 miles of chain link – required between 4,000 and 5,000 men hours to construct with material being ordered in bulk “in record time” to meet the deadline.
 
“I’m not worried about the Chamber, I’m worried about them,” added Keller in the interview.

You can see the video on WWE.COM.

Colin Vassallo
Colin Vassallohttps://www.wrestling-online.com
Colin Vassallo has been editor of Wrestling-Online since 1996. He is born and raised in Malta, follows professional wrestling and MMA, loves to travel, and is a big Apple fan!

Stories you might also likeRELATED
Recommended to you

LATEST NEWS

Audio issues spoil episode of Dynamite on TBS

AEW had several technical problems during last night's Dynamite on TBS where the audio was not cooperating. The show experienced...

WWE on A&E block (2024) ratings for week 8

Week 8 of WWE programming on A&E continued this past Sunday with an episode of Rivals and season three...

List of Superstars eligible to be drafted in the 2024 WWE Draft

WWE has published a list of Superstars who will be eligible for the Draft this Friday and Monday, with...

Discover more from Wrestling-Online.com

Subscribe now to keep reading and get access to the full archive.

Continue reading